Services > Engineering

Engineering

For you

We manage, plan, coordinate and supervise public and private works nationwide.
We implement an objective articulation between quality assurance, cost optimization, and deadline compliance.

Winhouses - José Fernandes

My name is José Peres Fernandes and I'll be responsible for helping your company. Contact Winhouses and we will reply as soon as possible.




    Featured Projects

    Winhouses - Millenium

    Millenium BCP

    AF Real Estate Portfolio Fund - Rua Amílcar Cabral, nº 23
    - Coordination and Supervision of Call Center for Reditus
    - Coordination and Supervision of Call Center for Luz Saúde
    - Coordination and Inspection of the Roof Waterproofing of these buildings
    - Analysis and Negotiation of Contract Proposals
    - Elaboration of the Specifications for the Tender of the Contracts

    Winhouses - Luz Saúde

    Luz Saúde

    Clínica do Hospital da Luz, in Odivelas - Coordination and supervision of the rehabilitation, remodeling and adaptation of 3 floors. Recovery of electrical infrastructures. Alteration and remodeling of installations. Execution of finishings. Total area: 8.500m2

    Winhouses - Hotel Alegria

    Mil Sugestões LDA

    Management, Coordination, Supervision and Security Coordination - HOTEL ALEGRIA, Praça da Alegria, nº 12. The rehabilitation and area increase work of the Alegria Hotel, with the purpose of being a 3-star HOTEL and consists of 36 rooms on 4 floors. The last floor is new.

    Engineering, more specifically

    Project Management

    Project Management and Coordination, including:

  • Selection of design teams
  • Project analysis and compatibilization
  • Launching of tenders with specifications
  • Analysis and negotiation of proposals
  • Follow up of project licensing
  • Contacts with the utilities suppliers
  • Management, Coordination and Work Supervision

    • Control of the respective progress of the works and respective deadlines, closing of accounts
    • Quality control of materials, equipment and work execution
    • Cost control and invoice verification
    • Preparation of reports with defined periodicity, containing status information and presentation of the photographic record
    • Follow-up of partial and final tests of the equipment
    • Commissioning of technical installations
    • Administrative management of the process
    • Preparation of the provisional and final acceptance of the work

    Coordination of Safety and Hygiene at Work

    • Informing ACT of the beginning of the work
    • Safety coordination from the project phase elaborating the PSS until the construction phase, applying the law decree nr 273/2003
    • Elaboration of safety plans and hygiene at work and elaboration of the technical compilation
    • Monitoring of safety on site
    • Safety inspections
    • Preparation of situation reports with photographic record

    Building Maintenance Management

    • Management of supplier subcontracts, equipment and maintenance teams
    • Cost control and invoice verification
    • Quality control of materials and equipment used in curative, corrective and systematic preventive maintenance actions
    • Preparation of preventive and curative maintenance plans
    • Management of small interventions in technical installations
    • Preparation of maintenance reports

    Environmental Management

    • Coordination, Supervision and Environmental Follow-up of Works
    • Waste Management Plans
    • Environmental Management Manuals
    • Monitoring Plans for Environmental Indexes (surface water, groundwater, air)
    • Identification / Analysis of Environmental Risks
    • Strategic Environmental Evaluations
    • Environmental Counseling

    Winhouses expertise is covered in different areas

    Shopping Centers

    Offices

    Residential

    Hospitality

    Healthcare

    Industrial & Logistics

    Previous Projects

    Winhouses - Santander

    Santander Bank

    Contacts with City Councils and Verification of the conditions of delivery of stores of the closed BANIF branches, nationally and on the islands.

    Winhouses - Santander Banco Popular

    Primestar / Banco Popular

    Supervision and Safety Coordination for the Completion of the Buildings (property of Banco Popular) located in Quinta da Areeira, lots 19 and 20, Camarate (Loures).
    Plot 19 - 1.057,25 m2 - 6 apartments - 3 floors above ground and one floor below ground.
    Plot 20 - 1.063,79 m2 - 6 apartments - 3 storeys above ground and one storey below ground.

    Winhouses - Vogue Homes

    Vogue Home

    Project Management, Supervision and Safety Coordination for the conversion of an office building to residential use at Av. Duque d'Ávila, 193, in Lisbon, with 8 apartments of 220 m2 each and garages.

    Winhouses - Millenium

    Millenium BCP

    AF Portfólio Real Estate Fund – Rua Alfredo da Silva, nº 3-3D
    Coordination and supervision of the contract works to change the use of a building from office to housing, with 8 floors, 22 apartments, in Lisbon. Requalification of the building, structures, infrastructures, technical installations, finishings. Construction area: 4.530m2.

    Winhouses - Malo Clinic

    Maló Clinic

    Analysis and Negotiation of Proposals for the Maló Clinic Contract in Funchal (1,600 m2).

    Winhouses - Olivier

    Restaurant Guilty - Olivier

    Management, Coordination and Supervision of the Restaurant Guilty - Olivier (276m2), at Rua Barata Salgueiro in Lisbon.

    Winhouses - MAPFRE

    MAPFRE

    Supervision of floors 3 and 7 of Av. José Malhoa, nº16 in Lisbon.

    Winhouses - Casa das Aguarelas

    Casa das Aguarelas Tourist Accommodation

    Management, Coordination and Supervision of the rehabilitation of a building and transformation into a Tourist Accommodation, located in the center of the village of Ericeira, with 375 m2, consisting of 3 floors and 13 rooms.

    Winhouses - Manpower Group

    MANPOWER

    Torres de Lisboa- Buildings G - Coordination and Supervision of 9,000 m2, consisting of 9 floors: Administration and Contact Center, Data Center, Executive Recruitment Offices, Auditorium and Cafeteria.

    Winhouses - Direção Regional Cultura Alenetjo

    Regional Directorate of Culture of the Alentejo

    Audit, Energy Certification, and respective issuing of the certificate (CE) under the Building Energy Certification System (SCE), for the Museu de Évora.

    Winhouses - Luz Saúde

    Luz Saúde

    British Hospital - Safety Coordination of the Civil Construction, Electrical and Mechanical Installations of the ORDER E FLOOR 0 - Renovation of the HV's and Rx and Floor 2 - Renovation of the HV's and ORDER B FLOOR 1 - Renovation of the Magnetic R. - 1.000 m2

    Winhouses - Ordem dos Médicos

    Portuguese Medical Association

    Supervision of the works:
    Almirante Reis Av. Apartment, 242- 5th Esq.
    Apartment Rua António Patrício, 22-1st Dto.

    Helen Keller Enterprise

    Management, Coordination, and Inspection of the Helen Keller Development, with 3,230 m2 above ground, with 9 floors and 16 apartments, and 1,380 m2 below ground, with 3 garage floors.

    Arconarrativo

    Management, Coordination and Supervision and Security Coordination of the Rehabilitation of the Building at Calçada do Sacramento, nº 26 to 32, for 6 luxury apartments and a store, in Lisbon.

    Condominium VIA ROMA

    Rua Conde Sabugosa, nº 6 - Preparation of Specifications, Tender Launching, Analysis of Proposals, Construction Supervision and Safety Coordination.

    Cleaning of the Stone and checking the fixation of the Façades Painting of a façade, Waterproofing of the Roof and of the Floreiras and new coverings, Waterproofing and new Pavements of the Swimming Pool Zone and New Skylight.

    Obsid Invest

    Project Analysis, Tender Launching, Bid Analysis, Tender Analysis, Construction Supervision, and Safety Coordination, keeping the façade, in a building with R/C + 1st, 2nd, 3rd, and attic, with about 50 m2 per floor.

    Fidelidade Insurance

    Remodeling of the Palmela and Sobral Palaces in Largo do Calhariz in Lisbon, to build the new headquarters, with a construction area of 27,000 m².

    Almada City Council

    1 . Management, Coordination, Supervision and Security Coordination of the Implementation of Facilities for staff of LU/DJEV Almada/Cova da Piedade/Cacilhas, on Rua D. João de Portugal, the Urban Garden of Monte da Caparica and the Fernando Lopes Graça Auditorium and the Romeu Correia Forum

    2 . Management, Coordination, Supervision and Security Coordination of the CIAV - Interpretation Center of Almada Velha, located in the center of the city of Almada with 325 m2, consisting of basement, first floor, second floor and roof

    3 . Coordination and Safety of the Roof Remodeling and Frames Replacement of Marco Cabaço Elementary School

    Nova Rede / Millenniumbcp

    - Alvalade II in Lisbon, Almada II, Cacém and Torres Vedras
    - Rio Maior, Pombal, Marinha Grande, Alfeizerão, Peniche
    - António Augusto de Aguiar, Imaviz Shopping Center, Av.
    Alvares Cabral, Praça do Chile and Centro Comercial das Amoreiras in Lisbon
    Lisbon

    We believe in the importance of our contribution to the development and valorization of our clients.

    Get in touch with us!

    We are available to clarify all your doubts.